COMPREHENSIVE ENGINEERING & PROJECT MANAGEMENT SERVICES
At Scarus Engineering Consultancy, we offer a full range of engineering and project management services to support efficient and high-performance powder processing operations. Our expertise covers:
- Feasibility Studies – Assessing project viability to ensure informed decision-making.
- Front End Engineering Design (FEED) Studies – Delivering precise designs to reduce risks and optimise project outcomes.
- System Process Design & Plant Layouts – Developing tailored solutions to maximise operational efficiency.
- Equipment Selection & Specifications – Identifying the most suitable equipment to meet project needs and industry standards.
- Process Flow Diagrams (PFDs) & Process & Instrumentation Diagrams (P&IDs) – Ensuring seamless system integration through accurate, detailed diagrams.
- Risk Assessments – Covering HAZOPS, ATEX, and PED compliance to guarantee safety and regulatory adherence.
- Project Management Services – Providing end-to-end oversight for timely and cost-effective delivery.
By leveraging our in-depth industry expertise, we help businesses streamline their powder processing systems with precision, safety, and reliability.



Optimising Powder Processing for Maximum Efficiency
At Scarus Engineering Consultancy, we provide expert consultancy for every aspect of powder processing. With over 30 years of industry experience, we deliver independent, tailored solutions that enhance efficiency, reliability, and compliance across the pharmaceutical, food and beverage, chemical, and materials manufacturing sectors.
Our unbiased approach ensures that every recommendation is based solely on performance, cost-effectiveness, and operational needs, rather than supplier affiliations. Whether you require process design, equipment selection, system integration, troubleshooting, or technical support, we help businesses achieve optimal results in powder handling.

✔ Process Design & Optimisation
- Developing tailored powder processing systems for enhanced performance.
- Reducing material waste, improving output, and increasing system efficiency.

✔ Technology Selection & Supplier Evaluation
- Identifying the best technologies for your operational requirements.
- Comparing supplier offerings to ensure the highest value and efficiency.

✔ Cost-Effective Equipment Recommendations
- Providing independent guidance on equipment selection.
- Ensuring an optimal balance between performance, reliability, and cost.

✔ Troubleshooting & Efficiency Improvements
- Diagnosing and resolving operational bottlenecks.
- Enhancing system reliability and minimising downtime.

✔ System Integration & Control Solutions
- Seamlessly integrating new and existing powder processing systems.
- Implementing advanced automation and control systems for improved efficiency.

✔ Powder Containment & Safety Compliance
- Designing bespoke containment solutions for hazardous and sensitive materials.
- Ensuring full compliance with industry safety regulations, including HAZOPS, ATEX, and PED.
Why Choose Scarus Engineering Consultancy?

✔ Independent Expertise – Unbiased, Performance-Driven Solutions
As an independent consultancy, we are not affiliated with specific suppliers, ensuring every solution is designed exclusively for your business needs.
- No Supplier Bias – Our recommendations are based purely on performance and value, not sales targets.
- Cutting-Edge Technologies – We assess multiple options to identify the best-fit solution.
- Tailored Consultancy – Every project is approached with a customised strategy to meet your specific objectives.

✔ Optimise Your Powder Processing Today
Looking to improve efficiency, safety, and cost-effectiveness in your powder processing operations? Contact Scarus Engineering Consultancy today to discuss bespoke solutions designed for your business.
Looking to optimise your powder processing operations? Get in touch with Scarus-Eng today to discuss customised solutions that improve efficiency, quality, and cost-effectiveness.